PDC4S:\D\Digital Tutors (digitaltutors.com)\Digital Tutors - 'Infiltrator' Production Pipeline Volume 3 - Rigging

Up one directory...
NameSizeDate Modified
01. Introduction and Project Overview.flv8,412 KB8/2/2013 1:27 PM
02. Starting on the Proxy Mesh for the Infiltrator.flv70,045 KB8/2/2013 1:29 PM
03. Finishing the Proxy Cage.flv49,339 KB8/2/2013 1:28 PM
04. Beginning the Infiltrator rig and creating the middle leg's bones.flv50,430 KB8/2/2013 1:28 PM
05. Creating Joint Chains for the rest of the legs.flv63,748 KB8/2/2013 1:28 PM
06. Building joints for the arms.flv56,355 KB8/2/2013 1:28 PM
07. Connecting IK Handles to the limbs and Parenting the Proxy Meshes.flv65,764 KB8/2/2013 1:28 PM
08. Starting on the revolving leg rig.flv44,100 KB8/2/2013 1:27 PM
09. Working on the Infiltrator's body rig.flv14,454 KB8/2/2013 1:26 PM
10. Leg controls for the Infiltrator.flv51,594 KB8/2/2013 1:27 PM
11. Creating knee controls.flv75,350 KB8/2/2013 1:28 PM
12. Setting up the Infiltrator's arm and elbow controls.flv40,494 KB8/2/2013 1:27 PM
13. Using Custom Attributes for the claws.flv51,899 KB8/2/2013 1:27 PM
14. Dynamically Parenting the arms to the body.flv42,692 KB8/2/2013 1:26 PM
15. The Center of Gravity control.flv17,667 KB8/2/2013 1:26 PM
16. Creating controls for the revolving legs.flv41,327 KB8/2/2013 1:26 PM
17. Finishing the revolve controls for the legs.flv30,376 KB8/2/2013 1:26 PM
18. Establishing a revolve control for the Infiltrator's body.flv43,810 KB8/2/2013 1:26 PM
19. Rigging the head.flv85,031 KB8/2/2013 1:27 PM
20. Beginning the eye rig.flv51,986 KB8/2/2013 1:26 PM
21. Finalizing the eye rig.flv59,361 KB8/2/2013 1:26 PM
22. Rigging the neck.flv46,076 KB8/2/2013 1:25 PM
23. Using Deformers to rig the head flexor.flv49,575 KB8/2/2013 1:25 PM
24. Rigging the pistons connected to the back shells.flv55,569 KB8/2/2013 1:25 PM
25. Creating controls for the back shells.flv65,191 KB8/2/2013 1:25 PM
26. Completing the shell rig.flv57,672 KB8/2/2013 1:25 PM
27. Automating the movement of the front shells.flv41,817 KB8/2/2013 1:25 PM
28. Adding automated subtleties with Set Driven Keys.flv45,612 KB8/2/2013 1:25 PM
29. Finalizing the automation of the front shells.flv31,420 KB8/2/2013 1:24 PM
30. Building a Global Control and organizing the scene.flv50,247 KB8/2/2013 1:25 PM
31. Working with Character Sets.flv17,338 KB8/2/2013 1:24 PM
32. Tying the Render Mesh of the Infiltrator into the control rig.flv67,218 KB8/2/2013 1:25 PM
33. Finalizing the Infiltrator control rig.flv73,387 KB8/2/2013 1:25 PM